Category Archives: Property

James and the giant price tag!

The house in which Roald Dahl was born has been put on the market. It was built by his parents in Llandaff, and was named Villa Marie – but is now known as Ty Gwyn.

The house has been put on the market for £1.45 million, so a keen fan of the much loved children’s author would have to dig deep into their pockets or be the owner of a chocolate factory!

Property News

A house in Hampstead has had its asking price slashed by a staggering £35 million and is now on the market for a mere £65 million!

As one of the most expensive houses in Britain, which was built in 1910 for Mr William Park Lyle of Tate and Lyle fame, it boasts 14 en-suite bedrooms, a huge wine cellar, pool, sauna, gym and even a panic room.

The house is also incredibly hi-tech, it features smart technology which enables you to switch on the lighting and heating from your ipad.

Home automation, which is already a big hit in the US, is set to become the next big “must have” item for the technology loving home owner with the ability to control many items around the house from your smartphone or tablet.

Building refurbishments and alterations

When carrying out building refurbishments it is important to plan out the end result that you would like to achieve. This is sometimes done by professionals like architects or surveyors but often it is left to the property owner and building contractor to finalise the specifications. This needs to be managed carefully because you do not want the works to not comply with the UK building regulations and other statutory requirements that can potentially cause expensive re-working if not done correctly. So your building contractor will need to have a good understanding of the building regulations and other statutory requirements. These are not always well known or understood by some building contractors, you will be able to get a feel for your builders knowledge by asking them some simple questions about the UK building regulations for instance what sections covers the structural elements? It is section “A”. There are other regulations for instance if you are going to use a computer screen in a commercial environment you will need to select the correct light fitting to meet the required regulations. This is not always known to some building contractors and could potentially have you paying for the same item of work twice. Again as with most things it can be a case of buy cheap buy twice.

Building refurbishments

Most property owners need various building refurbishments and repairs doing from time to time. These range from simple roof repairs through to electrical and building works. Many homeowners and in fact some building contractors are either unsure or unaware that even some repairs will trigger the need to inform the local authority building control department. This is usually done through a building regulations building notice. These vary in costs dependant on the value of the works being carried out, the building inspector will usually be required to conduct a site visit at various stages throughout the building works to check each element of the works as items are covered in. They will want to see drainage, insulation footings details and structural elements that fall under part “A” of the UK building regulations. Good building contractors will take care of managing the building notice as part of their service but ultimately the responsibility lies with the property owner. So make sure you check with your local building control department if your works will require a building regulations building notice application. Some works may not require a building regulations application when you start the works but a change to the works if an unforeseen issue arises can trigger the requirement for an application. Very often this is an issue under part “L”, of the UK building regulations. This is because if more than 25% of any external surface for examples roofs, floors or walls are being repaired it will require a building notice and site inspections.

Property development funding

The government like many builders and property developers is keen to get Britain building again and has identified a number of large development sites that have stalled simply because of a lack of suitable speculative property development funding. The government is looking to provide some of this much needed funding although the details have not been fully released. The funding shortage will be either in the form of primary funding the usually standard type of development funding currently available on the majority of site at around 55-65% of the loan to value. The second and less secure type is mezzanine funding this is a secondary and more complex type of development funding. It sits on top of the primary development funding and tops up the short fall usually taking care of the percentage difference between the maximum loan to value and a shortfall on the primary development. It is sometimes used to take care of the cash gap between paying the main contractors JCT stage valuations and the sales of the properties. Mezzanine funding often makes the difference between a development taking place and simply not being built out. However this type of development funding is considered risky for the investor as well as being an expensive solution for the site developer. The typical charges are between 25-40% of the investment required and this is usually the first monies to be realised after the primary development funding has been repaid from the sales of the properties. The developer who borrows the mezzanine funding usually also picks up all the soft costs like legal contracts and the mezzanine funder may ask for a directorship or other control of a SPV or special purpose vehicle or limited company used to run the development. It can also be beneficial to the developer because often mezzanine funder will have extensive property development experience and be able to give advice on contractors and with build specifications and off plan sales.

Solid concrete floors

Many properties both old and new have solid concrete floor slabs, these have both advantages and disadvantages over suspended timber floors. The main disadvantage with older concrete floors is that they can be prone to cracking and can sink or rise up if the substrate the soil or other matter below them has been either disturbed by things like tree roots or defecting water pipes and drains or have simply been constructed badly or damaged from some form of structural damage. The other disadvantage is that older floor slabs often lack both a DPM or damp proof membrane or any insulation and can act as a cold sink drawing heat from the property. It is also more of an issue if you need to retro fit pipe work or cables if you move or add items like sockets and radiators. Often these issues are raised by surveyors when a property is sold or remortgaged and they usually recommend that a structural engineer be commissioned to write a report on the possible causes and recommendations for the removal and remedial repairs to the floor slabs. It is usually recommended that the defective floor slab be replaced and a new DPM and insulation be installed. This will automatically trigger the need for a building notice and the works to be inspected at various stages by the local authority building inspector. Your building contractor should be able to take care of this for you but you should check to make sure they have the paperwork in place and the inspections booked at the appropriate time.

New Year, new building project

Today many people are starting New Year resolutions and many are planning to get those things done they have been putting off. After a Christmas at home is it time to consider getting that new home extension or building project underway. Many people are put off by not knowing where to start? Do you need an architect or a builder first? Well most home owners have some budget constraints so speaking to good reputable builders will give you some idea of if your project can be done in budget. They will also be able to recommend an architect who they have worked with before it is always a good idea to have a good working relationship between your main building contractor and your architect. They will be able to resolve design and site issues between them and will be keen to help each other out and get your building project complete as designed. It is also an ideal time as the design, planning and building regulation process timescales will mean that you are ready to get building in the spring a favoured time for many home owners. You could be showing your friends and family round your beautiful new home extension or completed building project at a summer barbeque. So why not get an easy tick on your new years to do list and get your building project underway in 2013.

House prices set to rise in 2013

Many property pundits and property professional like to make predictions on the future of the UK property market and house prices. There are also a number of banks and economists that are prepared to put their reputations on the line and estimate where the average UK house price will end up. These projections rarely vary greatly but some have proved far more accurate than other particularly after the last property boom. Amongst one of the best respected and accurate is the Royal Institute of Chartered Surveyors. They do have the advantage of having so many members who have the unenviable task of valuing people’s homes and properties. For the new year of 2013 they are predicting a rise in house prices of around 2 percent which given the economic landscape is a positive and sustainable increase. They are also tipping an increase in transaction volumes with the number of property sales thought to rise by a around the three percent mark edging them tantalisingly closer to the million sales marker. This is still a far cry from the heady days of average number of transactions edging up towards 1.7 million at the height of the property boom in 2006.

Cheap houses at property auctions

Many property investors, property developers or speculators are often looking for cheap or bargain properties most professional developers usually purchase off market. This is usually through property traders or from property auctions. Property auctions have changed dramatically in the last fifteen years with people from all over the country and world having access to online property auction listings. Many novice property developers and investors believe that it is simply a matter of chancing your arm at the auction buying a cheap property and then finding a good builder to get it back up to standard. However it is better to get your builder involved before you buy, they can often spot problems that you may miss and could potentially save you thousands of pounds. One thing to consider is that if you had a property with a serious structural or other defect and you wanted to mask the issue you would probably look to off loading a problem property through the property auctions. So be aware that less honest vendors may pass their problem properties onto you. So before you buy set a realistic budget for all the various trades and work that may be required to your auction property. A quick look at the type and age of the consumer unit (fuse box) can give you an indication of if the property may require a re-wire. There are some items that may seem a luxury but dependant on the area can be a good investment. Things like reinstating original period features or altering load bearing walls to open up smaller reception rooms to suit more modern family living styles. It is also important that you do not miss out items like outside space as this could put off drive by viewers and will affect the look of online details. You will find that many builders have worked on auction properties before and will be able to advise on what has worked well for other property speculators and developers.

Modern loft conversions

Home owners are often looking to add a bedroom or master suite and often with houses or bungalows that have large loft spaces a loft conversion is the answer. Loft conversions vary in cost and complexity dependant on the size, specification, layout and design of the existing construction. With more modern properties the roof structure is often constructed using roof trusses rather than the traditional stick built method of purlins and larger rafters. This means that members of the roof trusses are often in the way of living space and need to be removed to make the loft space useable and ready to be converted into a loft room. However when the roof trusses are altered or sections removed this can affect the structural integrity of the roof and this can be potentially dangerous and costly to repair if not done correctly. So your building contractor or architect will need to employ the services of a structural engineer to make sure that the new design conforms to part A of the UK building regulations and is safe. The alterations can be made if the existing structure is upgraded this is usually done by adding additional timber and steel supports usually in the form of steel beams or RSJ’s as they are more commonly know. These are often used to support the new floor joists and upgrade the roof structure once sections of the roof trusses have been removed. These new steels transfer the weight or loads from the new floor and roof structure down onto existing load bearing walls. It is important to select a building contractor who has experience in working with structural steels and carrying out more complex projects as the positions of these steels is critical to the structural integrity of the roof. This is particularly important if you currently have a trussed roof and you are installing ridge or cranked beams to carry the loads that have been transferred from the trusses that have been altered or removed.